home » Lego Crane
Resident’s access and traffic was brought to a halt on 21 May when Wellington St Street was shut down to enable a massive crane to be lifted on to the Lego High
Rise site.
Resident’s access and traffic was brought to a halt on 21 May when Wellington St Street was shut down to enable a massive crane to be lifted on to the Lego High
Rise site.
Comments»
No comments yet — be the first.